CE 5382: Construction Cost Analysis and Bidding
COURSE: CONSTRUCTION COST ANALYSIS AND BIDDING
LEVEL: GRADUATE
ASSIGNMENT # 2
TOTAL POINTS: 100
LEARNING OBJECTIVES:
After successfully completing this assignment, students will be able to:
• Differentiate between various construction processes and methods for cost estimation
• Understand direct and indirect cost associated with a construction project
• Understand various components of a good cost estimate
Note: Your work should be professionally presented and all the steps for calculations must be
included.
Remember that this assignment will be a part of the final
term project so please give proper attention to the details.
CE 5382: Construction Cost Analysis and Bidding
Problem Statement
Your company is interested in bidding for a commercial building project (you can choose
any location). Use the hint below to estimate all job overhead and assumed home office
overhead costs for that project. Please note that DRAWINGS ARE PROVIDED FOR
YOUR REFERENCE ONLY and you will not need to use all of them for this assignment.
The site plan will provide an overview of the project that is helpful to plan for some of
the temporary facilities. The duration of the project is 2 years. You can make
assumptions on the annual revenue of your company.
Hint
1. You should follow the examples in chapter 6 (Overheads and Contingencies) to
make assumptions and calculate these overheads (For home office overhead
follow figure 6.1, example 6-1 and for job overheads follow details on pages1 68-
70).
2. Please go through the estimating checklist under week 2 folder for various
indirect costs.
Grading
Your work will be graded based on the completeness and accuracy of the
following components:
o Cover sheet including your name and ID (-5)
o Assumptions made to complete your work for example what’s the annual
revenue of your company, office rent etc. in order to calculate home office cost
allocation (-15)
o Calculations needed to get all the quantities and cost numbers (-50)
1 The page number can be different if you have different edition of the textbook. Please contact the TA in this case.
CE 5382: Construction Cost Analysis and Bidding
o Project estimate summary excel sheet attached as an Excel sheet. You will only
fill out the portion for the overhead cost ONLY in that excel sheet (-20)
o References including your cost resources (-10)
Quote of the Day:
“The secret of getting ahead is getting started. The secret of getting started is breaking your
complex overwhelming tasks into small manageable tasks, and then starting on the first one.”
Mark Twain
20
fei04054_inserts.1.qxd 11/16/07 2:42 PM Page 20
21
fei04054_inserts.1.qxd 11/16/07 2:42 PM Page 21
22
fei04054_inserts.1.qxd 11/16/07 2:42 PM Page 22
23
fei04054_inserts.1.qxd 11/16/07 2:42 PM Page 23
- 1
- AppC_A1
- AppC_A2
- AppC_A3
- AppC_A4